Projects Our yard is fully equipped with necessary accessories, tools and equipments to work two shifts with about 20 gangs of 7 person each. Our Estimated daily production: 1 shift : 12 tons per day 2 shifts : 18 tons per day 
Hail Mary 650 tons DWT Inland barge built under IV act and - IRS classFor Kerala Backwater Navigation Company, KochiProduction schedule Keel laying : 10th Jan 07 Work commenced : 10th Feb 07 Successfully launched by : 7th August 07 | |
Physical Dimensions | Length | 52.8 Mtrs | Breadth | 10.5 Mtrs | Depth | 2.8 Mtrs | Load | 650 tons at 1.8 Mtrs | Powered By | 2 x 170 Hp AL 680 TC Diesel Eng | Propulsion | Twin Screw
|
| 150 tons DWT Landing Craft (exported to Maldives) Production Schedule: Contract Finalization : April 07 Keel laying : 23rd April, 07 Work Commencement : 23rd April, 07 Succesfully launched by : 29th June 07 | |
Physical Dimensions | Length | 28 Mtrs | Breadth | 9 Mtrs | Depth | 2.5 Mtrs | Load | 150 tons at 1.5 Mtrs | Powered By | 2 x 190 Hp AL 680 TC Diesel Eng | Generator | 2 no 15 KVA |
| 90 tons DWT Jhankar/Ro-Ro Vessel : 2 Nos - IRS approvedFor Kerala Shipping and Inland Navigation Corporation, Kochi Production Schedule: Work Commencement : 7th January,08 Keel laying : 21st January,08 Successfully launched by : 20th April, 08 | |
Physical Dimensions | Length | 28 Mtrs | Breadth | 7.3 Mtrs | Depth | 1.5 Mtrs | Load | 90 tons at 1 Mtrs | Powered By | 2 x 106 Hp ALM 402 Eng | Propulsion | Twin Screw
|
|
| Some of our ongoing projects are :1600 tons DWT Multipurpose Coastal Container Vessel-IRS class For Trans Asia Line, Singapore | Production Schedule:
Keel laying : 29th August, 07
Work Commencement : 01September, 07
Expected launching date : 24.04.2009 | |
Physical Dimensions | Length | 68.8 Mtrs | Breadth | 12.8 Mtrs | Depth | 5.6 Mtrs | Load | 1600 tons at 3.2 Mtrs | Powered By | 2 x 640 HpCummins KTA
| Propulsion | Twin Screw
|
| 610 tons DWT Inland barge built under IV act and - IRS class For Kerala Shipping & Inland Navigation Corporation, Kochi. Production Schedule: Work Commencement : 27 April,08 Keel laying : 29 April,08 Expected launching date : 01 June, 09
| | |
Physical Dimensions | Length | 52.2 Mtrs | Breadth | 10 Mtrs | Depth | 2.8 Mtrs | Load | 610 tons at 1.8 Mtrs | Powered By | 2 x 170 Hp ALM 680 Diesel Engine | Speed | 7-10 Knots
|
| | We have already bagged another order for 2700MT Container Ship for Trans Asia Line, Singapore.
|
|